Day Twelve 5-21-2021

 Rub Rails

Today we worked on the rub rails; milling, sanding, fitting, and finishing. We started by getting my already cut pieces along with the boys’ pieces and we milled them to be a U-shape with the router table. We milled the rub rails for my brother’s boat as well while the router table was out. After that I sanded them down to be smooth and nearly perfectly round. After I was done sanding I planed the ends of the rub rails so that they would be rounded. After that we made sure to fit them to the boat and drill the holes into them where the ribs laid. After lunch I put two coats of finish on them and called it a day. 



Comments

Popular posts from this blog

Week One (5-10 to 5-16)

Day Five 5-14-2021

Weekly Reflection