Day Eight 5-17-2021

 In-wales and the Floor

Today was a really neat day because we finished all of the frame work of the boat. We attached one inhale in the morning, it involved an absurd amount of clamps and stress, but only a bit of glue and messing up. First we fitted each end to the decks and then prepared our clamps so that we would be able to connect the in-wale, out-wale, and each of the ribs together with glue. Once done we began on the floor which was actually pretty fun. We fitted, cut, and sanded each piece before we went on our lunch break. After lunch we set up to rivet the floor pieces together before my dad's client arrived for a meeting. I 'harvested' clamps so that after we could attach the second in-wale and cut any loose strings from the lashings that we had done. After the meeting we attached the second in-wale, this time flawlessly and without me messing up, and proceeded to connecting floor pieces. We riveted the pieces together and called it a day, I should be able to get a coat of finish on tomorrow! (hours: 8:15-12:15 and 1-4 seven hours)




Comments

Popular posts from this blog

Week One (5-10 to 5-16)

Day Five 5-14-2021

Weekly Reflection